Skip to content
MS 02
STIRRED BATCH MEMBRANE SETUP
DESCRIPTION
A Stirred Batch membrane setup should be mounted on a steel structure.
Pressure can be given in the system by means of high pressure pump or N2 Cylinder. Retentate line should be connected to rotameter.
Permeate should be collected from the bottom of the cell through a common outlet.
The setup should consist of appropriate feed inlet, Retentate outlet, piping, valves (SS) etc. so that system can run independently.
Product & Code |
STIRRED BATCH MEMBRANE SETUP & MS 02 |
Material of construction |
Stainless steel (SS-304) Membrane module |
Volume of the cell |
500 cc. |
Membrane support |
Plate type with fine mesh (02 numbers) |
Membrane holder |
75 mm diameter |
Pressure |
Maximum operating 20Kg |
Pressure gauge |
25 kg |
Stirrer |
0-1500 RPM with speed controller (stirrer should run continuously for at least for 3 hours) |
Rotameter (01) |
Flow rate: up to 300 LPH |
error: Content is protected !!